Precept

Five parts, one control library.

Controls, evidence, owners, risks and audits live in one place and point at each other. Change a control once and every framework it maps to sees the change.

01 / 05Datum · controls

Write each control once.

Your control library in your words, not ours, with its history kept. Every control carries its clause references, so “where is this used?” has an answer.
Harrow Freight/Controls
118 controls
IDControlOwnerStateClauses
PC-AC-04Quarterly access reviewMBPassing8
PC-AC-06Privileged access in AWSRMPassing6
PC-CM-03Production changes approved before mergeRMFailing6
PC-HR-02Security awareness trainingSBIn progress9
PC-HR-04Leaver access removed in two daysSBPassing7
PC-CR-01Encryption at restOAPassing8
PC-VR-01Vendor security reviewGNPassing10
PC-AI-01Route-planning model inventoryRMPassing3
02 / 05Chain · evidence

Evidence from the systems that hold it.

Pulled on a schedule, dated, attached once and counted under every clause its control maps to. What can’t be pulled gets an owner and a due date.

AWS · Google Cloud · Microsoft Azure · Okta · Google Workspace · Microsoft Entra ID · GitHub · GitLab · Jira · Workday · BambooHR · Rippling · Jamf · Kandji, and 26 more.

Harrow Freight/Evidence
Last 7 days
  • Q2 access review sign-off, production
    14 Jul 15:20
    Manual · PC-AC-04
    counts under 8
  • User export, Q2
    1 Jul 09:12
    Okta · PC-AC-04
    counts under 8
  • Credential report
    1 Jul 09:14
    AWS IAM · PC-AC-04, PC-AC-06
    counts under 14
  • Leavers, June
    1 Jul 07:00
    Workday · PC-HR-04
    counts under 7
  • Disk encryption, 1,212 devices
    1 Jul 05:00
    Jamf · PC-EP-01
    counts under 6
  • Branch protection, 41 repositories
    30 Jun 18:02
    GitHub · PC-CM-03
    counts under 6
  • 2-step verification enforcement
    1 Jul 06:30
    Google Workspace · PC-AC-02
    counts under 8
03 / 05Witness · owners

A name on every control.

One owner signs for each control, and the sign-off is dated. When an owner leaves, their controls are listed the same day.
Harrow Freight/Owners
8 owners · 118 controls
  • RMRavi Menon · Head of Engineering261 due
  • MBMarcus Bell · IT Operations Lead22Signed
  • OAOwen Achterberg · Security Engineer212 due
  • DODana Okafor · Director of Compliance14Signed
  • SBSofia Brandt · People Operations Lead121 due
  • LFLeah Fontaine · Warehouse Systems Manager9Signed
  • GNGrace Nwosu · Vendor Manager8Signed
  • TKTom Keller · Finance Systems Lead6Signed
04 / 05Tolerance · risks

Risks tied to the controls that treat them.

Scored before and after their controls. If a control fails, its risks show their old score again.
Harrow Freight/Risks
Scored of 25
  • RSK-031
    Ransomware on dispatch systems
    Treated by PC-BC-01, PC-VM-02, PC-EP-01
    20 → 10
  • RSK-009
    Unpatched depot handheld devices
    Treated by PC-AC-09, PC-VM-02
    16 → 9
  • RSK-022
    Carrier with TMS access is breached
    Treated by PC-VR-01, PC-AC-06
    15 → 8
  • RSK-017
    Former staff retain production access
    Treated by PC-AC-04, PC-HR-04
    12 → 4
  • RSK-004
    Loss of reefer temperature telemetry
    Treated by PC-LG-01, PC-BC-01
    12 → 6
05 / 05Transit · audits

Every request, tracked to the answer.

Requests from auditors and from customers’ security teams arrive in one queue, each showing the controls it touches, the evidence that already answers it, and what’s missing. Most are answered within a day.

How audits run on Precept
Supporting feature · Closure, readiness count

How many controls would hold today.

Inside Transit, Closure counts the in-scope controls with current evidence and a named owner, for each framework. It isn’t a score we invent; it’s a count you can open.

Harrow Freight/Transit
Fieldwork · week of 13 Jul
RequestAsked forFromReceivedState
REQ-2291Q2 access reviews, all in-scope systemsAuditorTue 10:40Sent Thu 12:15
REQ-2292Change sample: 25 production changesAuditorTue 11:0219 of 25
SQ-0418Security questionnaire, 212 questionsFenwick GrocersWed 08:45188 of 212
REQ-2294Incident response tabletop recordAuditorWed 09:30Sent Wed 14:10
REQ-2296Backup restore test, Q2AuditorThu 09:05Evidence due 20 Jul
REQ-2288Background checks, new hiresAuditorMon 16:20Sent Tue 09:05
Harrow Freight/Transit/Closure
Thu 16 Jul 2026, 12:15
  • All controls109 of 118 · 6 ◧ · 3 □
  • SOC 290 of 96 · 4 ◧ · 2 □
  • ISO 2700196 of 104 · 5 ◧ · 3 □
  • NIST CSF 2.084 of 88 · 3 ◧ · 1 □

Four supporting features.

Not parts of their own. Each works across the five parts above.

Tie-in the crosswalk
Shows how much of the next framework your controls already answer.
Baseline spreadsheet import
Reads your existing control spreadsheet into Datum on day one.
Survey control matrix
Every control against every framework, on one screen.
Closure readiness count
How many in-scope controls would hold if fieldwork started today. Shown inside Transit.