Precept
Customers

Tuesday to Thursday lunch.

Harrow Freight moves refrigerated freight for grocers across 31 depots. Its first SOC 2 Type II audit on Precept covered 1 January to 30 June 2026. This is how the busiest week of fieldwork went.


Before Precept, Harrow’s compliance programme was a spreadsheet of 140 rows, a shared drive with a folder per framework, and Dana Okafor’s memory. “The spreadsheet was accurate on the day I finished it,” she says. “It was the shared drive that wasn’t.”

Baseline read the spreadsheet in the first week. Twenty-two rows turned out to be the same control written twice, once for SOC 2 and once for ISO 27001; Datum merged them, leaving 118. By week three, SOC 2 was mapped. By week nine, every control had current evidence and an owner.

Closure · Harrow FreightControls, of 118 in scope
Weeks on Precept, from November 2025
  1. 1Week 0Spreadsheet imported. 140 rows read, 22 merged, 118 controls.
  2. 2Week 3SOC 2 mapped. Mapping isn’t evidence: 58 of 118 here, and climbing.
  3. 3Week 9First clean evidence pass. Both lines at 118.

“Clean” means every in-scope control has current evidence and a named owner. It doesn’t mean the audit is over.

Evidence expires, so the count moves: after week 9 it drifts and gets pulled back.

Fieldwork started on 13 July. The auditor’s largest request, REQ-2291, arrived at 10:40 on Tuesday 14 July: evidence of Q2 access reviews for all in-scope systems, with sign-off and remediation. Transit matched it to two controls, with the Okta export and AWS IAM report already attached. Two sign-offs were missing; their owners signed the same afternoon. One exception, a contractor account, came with its revocation ticket.

“I sent it at quarter past twelve on Thursday. Seven attachments. No follow-up questions. That’s the first time I’ve written that sentence.”
Dana Okafor, Director of Compliance
spreadsheet rows to controls
140 → 118
spreadsheet rows to controls
first clean evidence pass
Week 9
first clean evidence pass
REQ-2291, received to sent
2 days, 1 h 35 m
REQ-2291, received to sent

Next for Harrow: the ISO 27001 certification audit, scheduled for March 2027. Tie-in put it at 71 of 93 Annex A controls already answered. Run your own pair